Calculator

Quota capacity, without the reps-times-quota lie

Put in the team you have, the ramp, the attrition you are willing to plan for, and the hires by quarter. The page returns effective capacity, the gap to your target, and the rep-years that gap represents. Defaults are a worked example, not a benchmark.

Capacity planner · Commission calculator · Read the capacity guide

Team you already have
Fully ramped on day one of month 1. People still in ramp do not belong in this box.
Linear: month k of a new hire produces k / ramp, capped at 100%.
Applied as monthly retention, at the end of each month.
The number
Changes the symbol only. The math does not convert currencies.
Hires by quarter

Each hire joins on the first month of that quarter: January, April, July, October. They are not spread across the quarter.

The plan appears here once the page script runs.

How the capacity math works

This is a planning model for one year of twelve months. It is an expectation, not a simulation of named people, and it is not a forecast of a particular calendar year. Month labels say January through December because most quota years are calendar years. If your fiscal year starts in another month, treat January as month 1.

The inputs are used like this:

  • Monthly quota is the annual quota divided by 12.
  • Starting reps are already fully ramped. Their productivity is 100% in every month they are still here.
  • A new hire in tenure month k produces min(1, k / ramp months) of a fully ramped month. A 4-month ramp is 25%, 50%, 75%, then 100%.
  • Attainment scales every one of those months. 80% means you are planning for the team to land 80% of quota, not that every rep will.
  • Annual attrition becomes a monthly retention rate of (1 − annual attrition) raised to the power of 1/12. Headcount is reduced at the end of the month, so a leaver still produces in the month they leave. Fractional people are allowed. That is the expectation, not a ghost employee.
  • Q1 hires join in month 1, Q2 in month 4, Q3 in month 7, Q4 in month 10. The model does not spread a quarter’s hires across three months.

Effective capacity is the sum of those monthly contributions. The gap is capacity minus the annual target. A negative gap is a shortfall. The straight line on the chart is the target divided by 12. It is a pace marker, not a claim that bookings arrive evenly.

A rep-year is one fully ramped rep, retained for the whole year, producing at the attainment you entered. Rep-years delivered equal capacity divided by (quota × attainment). Rep-years required equal the target divided by the same figure. The difference is not a requisition. A hire in November is not a rep-year. At 0% attainment the rep-year is undefined, because a fully ramped rep would also produce nothing, and the page says so instead of dividing by zero.

A hand check

One fully ramped rep, a $120,000 quota, 100% attainment, no attrition, and no hires produces $10,000 a month and $120,000 for the year. The gap to a $120,000 target is zero. That is one rep-year, and it is the unit the tests lock.

One January hire, same quota and attainment, a 4-month ramp, and no attrition produces 0.25 + 0.50 + 0.75 + nine full months = 10.5 months of quota, or $105,000. The same hire joining in October produces 0.25 + 0.50 + 0.75 = $15,000, and the cohort table marks them as still ramping. Same seat, seven times the in-year capacity, because of when they start.

At 100% annual attrition the monthly retention rate is zero. The starting rep produces the first month ($10,000 in the hand check) and is then gone. That extreme case exists so the timing of attrition is not a hidden assumption.

The worked example on the form

The form opens with 12 ramped reps, a 4-month ramp, a $480,000 quota, 80% attainment, 18% annual attrition, hires of 3 / 2 / 2 / 1, and a $7,000,000 target. None of those figures is a market benchmark. They are round planning assumptions so the page is not blank. In this version of the model that example produces $5,890,616 of capacity, a shortfall of $1,109,384, about 15.3 rep-years delivered against about 18.2 required, and a Q4 hire who is still ramping in December. If a later change moves those totals, this paragraph and the test that locks $5,890,616 have to move together.

What the model leaves out

  • Seasonality. The target pace is a straight line.
  • Reps who are already partway through ramp. The honest workaround is to count only fully ramped people as starting reps. Putting a half-ramped rep into Q1 hires overstates the ramp they have left.
  • Different quotas by segment, overlays, partners, and a multi-product mix.
  • A ramp that is not linear. Many teams are nearer to “almost nothing, then a step.” You can approximate that with a longer ramp, and you should say you did.
  • The weeks between an accepted offer and a start date. The model starts the clock on the join month.
  • Whether you should hand a rep a quota equal to this capacity. That is a territory decision. The capacity guide and the quota guide are the place for it.

Commission earnings

A marginal-rate sketch of base, variable, an accelerator, an optional decelerator, and a flat SPIF. It is plan math, not a paycheck and not tax advice.

Plan
Added once. It is not multiplied by attainment.
Rates
1.5 means dollars above the threshold pay 1.5 times the plan rate. Use 1 for no accelerator.
0.5 pays half the plan rate on bookings below the threshold. 0 pays nothing in that band.
Optional withholding
This is your assumption, not a tax table. Blank means the page will not pretend to show take-home pay.

Earnings appear here once the page script runs.

How the commission math works

The plan rate is variable-at-plan divided by quota. In the worked example that is $80,000 / $600,000, or 13.333% of bookings. Bookings equal quota times attainment. Commission is paid in bands, the way marginal tax works. A dollar of bookings is paid once, at the rate of the band it falls in. The calculator does not go back and re-rate the first dollar when the rep crosses 100%. That retroactive cliff is a different design, and it is a common way to make people sandbag. The comp plan guide explains why this page refuses to do it.

  • If the decelerator is on, bookings from 0 up to that threshold pay plan rate times the decelerator multiple.
  • Bookings from the decelerator threshold (or from 0, if it is off) up to the accelerator threshold pay the plan rate.
  • Bookings above the accelerator threshold pay plan rate times the accelerator multiple.
  • Base is paid in full. It does not scale with attainment. Draws are not modeled.
  • A SPIF is a flat amount you type. It is not a recommendation, and it is not multiplied by attainment.
  • Gross earnings are base + commission + SPIF. If you type a withholding percent, estimated take-home is gross times (1 − that percent). Leave it blank and the page shows gross only.

Hand check, decelerator off, accelerator of 1.5× above 100%. At 100% attainment, commission is $80,000 and gross is $160,000. At 110%, the first 100% still pays $80,000 and the next $60,000 of bookings pays 1.5 × 13.333%, which is $12,000. Commission is $92,000 and gross is $172,000.

With the decelerator on at 50% and a 0.5× multiple, 40% attainment pays only in the low band: 0.40 × $600,000 × 13.333% × 0.5 = $16,000. At 80% attainment the first half of quota pays $20,000 and the next 30 points pay the full plan rate, $24,000, for $44,000. A linear plan with no decelerator would have paid $64,000 at 80%. The gap is the point of the control.

This is not payroll. It ignores tax brackets, pre-tax benefits, local taxes, caps, splits, guarantees, and clawbacks. Do not hand the take-home figure to a rep as net pay.